Fort Yates, ND - Main Transmission Pipeline Contract 3-8

Fort Yates, ND

The project scope was to connect the Standing Rock Rural Water System to the Fort Yates Tank Pipeline allowing the two systems to share water. The work consisted of installing 64,109 LF of 18" PVC pipe by excavation and directional drilling methods, 1,600 LF of Horizontal Directional Drilling which included 36" HDPE casing pipe, a pressure reducing station and vault, and 90 acres of seeding and erosion control.